Power plant bidding conditions (1130 t/H) high temperature and high pressure furnace

Click the appropriate classification can filter out the classification of products, click the product can view the details of the product.

News classification

Power plant bidding conditions (1130 t/H) high temperature and high pressure furnace

Release date:2016-01-06ChengFu group administration department click:

A, quote separately: 

Quote: 1, boiler 

(1) which all valve body according to the jiangsu thermal power considerations, including feed water control valves, water bypass valve and decrease water valve, superheater export electric gate according to the consideration. 

(2) the quotation does not contain the attached steel and tight seal. 

2, boiler installation quotation: this fee included in the scene after unloading, party a is responsible for only provide temporary boiler for live nearby. After the installation of the boiler with the whole paint again. 

Note: the quoted prices should not contain boiler installation inspection fees, by party a to pay. Party b is responsible for the file material and the corresponding coordination work. 

3, boiler casting quotation: materials and artificial cost quotation separately. To advocate material physical and chemical indices and origin. Respectively in shandong and jiangsu manufacturer to quote separately, and for matching. 

Include boiler oven, oven use fuel provided by party a. 

Line 4, the boiler body, ontology, drum and header heat preservation costs: to clear the use of materials, producing area, and external thermal insulation molding color plate thickness, etc. 

5, oil boiler ignition system cost: according to the combustion and jiangyin xu chong jie two manufacturers offer separately, and for matching. 

6, shock wave sootblower expenses: according to the good quality on the market two or three manufacturers to separate quotation, for matching. 

Second, the technical indicators: 

The boiler plant to have clear quantitative technical indicators in the technical agreement. 

The thermal efficiency of boiler design 

The boiler thermal efficiency 

Boiler slag and fly ash containing carbon carbon target ranges 

The bed pressure and bed temperature measurement under the rated load (design) under the condition of coal 

Boiler furnace temperature temperature table, separator outer wall temperature, etc 

Boiler parts, use cycle (cap, and target castable, etc.) 

Design coal boiler using SO2 and NOX control the range of (the first index of northeast Inner Mongolia lignite and bituminous coal in preliminary estimates) 

Note: telephone boiler after put into operation, such as technical indicators, there is an obvious deviation from party a will do clear penalties stipulated in the commerce clause, the final adjustments in quality retention money payment. 

Mr.wong 15245173456 heilongjiang ChengFu food group co., LTD 

Heilongjiang ChengFu food group co., LTD 

On January 4, 2016 


Related tags:threonine

Recent browse:

1474288555.png扫描二维码了解更多
服务热线
0455—7747227
1468913582107243.jpg1468913582533594.jpg1468913583445120.jpg

Copyright © 2015 heilongjiang ChengFu food group co., LTD 

 

Enterprise substation 


S
e
r
share